- Roy_A_LingleHi Folks!
It is my understand that in place of buying more Wolverines, the Army funded a program to upgrade the MLC 60 bridges on the M-48/60 AVLBs to a MLC of 70. Much cheaper to buy upgraded folding bridges than rebuild a M-1 into a Wolverine.
Spot Report!
Sgt, Scouts Out!
- bsmart
I can see and advantage to modifying the older AVLBs in the short term but as there are extra M1 chassis in the inventory I would think that converting some to support vehicles such as AVLBs, recovery vehicles and engineering vehicles would make sense.
- Roy_A_LingleHi Bob! Hi Folks!
- bsmart
I can see and advantage to modifying the older AVLBs in the short term but as there are extra M1 chassis in the inventory I would think that converting some to support vehicles such as AVLBs, recovery vehicles and engineering vehicles would make sense.
I have to agree with that Bob. However the problem is a lack of funds. The Wolverine and the Grizzle are programs that were cut to free up funding for the Stryker FOVs and has yet to be restored.
It's like Joe D said, their are just not needed in the current fight. Look at the M1117 ASV. It was also one of those programs that was cut to free up funding for the Stryker FOVs. If's fund has been restored some because they are needed.
This is another one of those things where funding is the controlling factor and not common sense.
Sgt, Scouts out!
- bsmart
I think there is very little that is not controlled by short term funding issues.
I'm noticing a trend that we saw in the 60s where long term programs are being sacrificed to pay for growing operational costs while trying to stay within lower 'acceptable' budgets. I remember living in the aftermath of that on the flightline in the mid 70s with not enough parts because although they bought a new fighter ( the F-15) they scimped on the supporting kit to hold the cost of the program down.